Blister Pack Cost per Unit: What Actually Drives It

By the Green Medical Packing engineering team

Blister Pack Cost per Unit: What Actually Drives It

Two quotes for the same blister pack rarely differ because one supplier is cheaper per kilogram. They differ because the two offers assume different gauge, different cavitation, different waste allowances and different line speed. Comparing them on price per kilo hides exactly the variables that decide the cost.

The cost of a blister pack is a stack, not a price

A finished blister card carries five cost lines:

  • Cavity film, priced by area and gauge rather than by weight alone.
  • Lidding foil or film, priced by area, gauge, temper and print.
  • Tooling, an upfront cost amortised over the order or the product life.
  • Waste, including setup, start-up, reject and end-of-reel losses.
  • Line time, which converts machine hours into money at a rate the buyer often knows better than the supplier.

Only the first two appear on a material quotation. The other three decide whether that quotation translates into a cheaper pack.

Start with the film area, not the kilogram price

Film consumption follows the card layout, not the tablet count. A useful first estimate:

1. Take the pitch across the web (cavity width plus the gap between cavities). 2. Take the number of rows per cycle. 3. Multiply to get the web width the roll must cover. 4. Add the trim at both edges, which the forming tool decides.

Weight then follows from area, gauge and density. Rigid PVC sits close to 1.38 g/cm³ and aluminium foil close to 2.7 g/cm³, so a gauge change moves material cost in proportion, while a layout change moves it in a way that a per-kilogram price cannot show.

This is why a pack with four large cavities can cost more than a pack with twelve small ones at the same nominal tablet count. The roll is wider and the trim is larger, even if the grams look similar.

Cavitation and yield

Cavitation is the lever with the widest range. Moving from a single-row to a multi-row tool raises output per cycle, but it also raises the film width, the sealing area and the tonnage the press must deliver. Beyond a point, the extra width costs more film than the extra cavities save in machine time.

A practical way to test a cavitation proposal is to compute film consumption per thousand cards at each layout, then add the line time per thousand cards. The layout that wins on both numbers is the one worth tooling. Layouts that win on one and lose on the other need a decision about which resource is scarcer in your plant.

Waste: the line between quoted and actual

Quoted waste is usually a percentage. Actual waste is a list:

  • Setup and start-up while forming and sealing stabilise.
  • Rejects from web wandering, wrinkles or seal gaps.
  • End-of-reel remainder that is too short to run.
  • Trim, which is generated on every cycle and never becomes product.

Two suppliers can quote the same percentage and produce different actual figures, because the percentage is applied to different assumptions. Ask what the allowance covers, and whether trim is inside or outside it. A supplier who separates trim, setup and reject gives you a number you can check against your own downtime records.

Line speed is a cost line too

Faster is not automatically cheaper. A material that runs twenty percent faster but rejects twice as often can cost more per good pack. The reverse is also true: a heavier gauge that forms reliably at high speed can beat a lighter gauge that needs slow, careful running.

The honest comparison is cost per thousand good packs at the speed the line actually sustains, not at the speed printed on the machine plate. If a supplier cannot state a realistic running window for the gauge offered, the quote is missing its most important input.

LeverEffect on costWhat to check
Gauge downLower material cost per cardForming window, barrier, seal strength
More cavitationLower machine time per cardFilm width, press tonnage, trim
Tighter trimLower material lossRegister tolerance, edge quality
Recycled or PVC-free structureDifferent material price and claim valueBarrier data, documentation, market acceptance
Higher line speedLower machine cost per cardReject rate, seal consistency
Larger order quantityBetter amortisation of setup and toolingStorage life, change control

How to compare two quotes

Put both offers into the same shape before discussing price:

1. Cost per thousand cards at the specified gauge and layout. 2. Material weight per thousand cards, showing trim separately. 3. Waste allowance, split into setup, reject and trim. 4. Line speed assumed, with the forming and sealing window stated. 5. Tooling cost, and who owns the tool afterwards. 6. Documentation included: certificate of analysis, compliance statements, change notification.

When the two tables look alike, the price difference is real. When they do not, the difference is usually in gauge, trim or speed, and it will show up later as a yield surprise rather than a price saving.

What to ask before you negotiate

  • Which gauge does this price assume, and what is the tolerance?
  • How many cavities, and what web width does that require?
  • Is trim inside or outside the waste allowance?
  • What running speed is assumed, and on which tooling?
  • What changes if volume halves, or doubles?
  • Which parameters are guaranteed in writing, and which are typical values?

The answers turn a quotation into a specification you can audit. For the material side, our notes on blister film specifications and on blister tooling cover the parameters that appear in those answers, and the standard blister PVC category page lists the gauges we supply. Where a pack has to hold a moisture limit, the high-barrier category explains when a lower gauge is not the cheaper option.